Theater Feasibility Study
In 2010, the Goshen Theater Taskforce engaged Westlake Reed Leskosky to conduct a feasibility study for the renovation of the Goshen Theater to create a center for arts and entertainment in the downtown. The study confirmed that the theater could indeed be successful, provided a nonprofit organization could be established to operate the theater and conduct a major fundraising campaign.
You can read the 2010 feasibility study results here:
- Introduction (200k pdf file)
- Market Study (1.5mb pdf file)
- Community Survey (3mb pdf file)
- Demographics (2mb pdf file)
- Pro Forma (200k pdf file)
- Architectural (1mb pdf file)
- Mechanical (2.5mb pdf file)
- Audio Visual (300k pdf file)
- Electrical (1mb pdf file)
- Summary (1mb pdf file)
- Resources (1mb pdf file)